Skip to content
HEAKOR.
EN

Your selection takes priority. You can change it at any time.

Some product and technical content is available in English.

Request A Quote

HEAKOR / Buyer knowledge

Transformer buying,
made clearer.

Practical transformer buying guides for the decisions before a purchase.

Prepare the specification, check document scope and compare proposals on the same basis.

Choose your next task

What are you working on?

Start here / Procurement essentials

A better enquiry makes a better starting point.

Bring the electrical ratings, site conditions, destination, quantity and required documents together before requesting a quotation.

Open the transformer RFQ checklist
  1. 01Identify the equipment and application
  2. 02Define electrical and site requirements
  3. 03List documents and approval needs
  4. 04Clarify quantity, destination and timing

The guide library

Read. Check. Prepare.

Use these guides to prepare questions for your technical team and supplier. Project documents govern final selection.

Dry-Type Transformer Temperature Rise vs Insulation Class
27 Oct 2026

Dry-Type Transformer Temperature Rise vs Insulation Class

Compare dry-type transformer temperature rise with insulation class. Align the offered rating, site conditions, thermal guarantee and supporting evidence bef...

Read the guide
Buchholz Relay Gas Sampling: Ground-Level Package Scope
26 Oct 2026

Buchholz Relay Gas Sampling: Ground-Level Package Scope

Buchholz relay gas sampling at ground level calls for a reviewed accessory package. Use this EPC checklist to define the relay connection, tube, fittings, su...

Read the guide
Dry-Type Transformer Winding Substitution: Approval Checks
26 Oct 2026

Dry-Type Transformer Winding Substitution: Approval Checks

Dry-type transformer winding substitution from copper to aluminum calls for a documented review of losses, physical fit, terminations and approval evidence. ...

Read the guide
Transformer Winding Resistance: Factory vs Site Reports
26 Oct 2026

Transformer Winding Resistance: Factory vs Site Reports

Transformer winding resistance reports need a common temperature, tap and terminal basis before factory and site results can be compared. Use this EPC guide ...

Read the guide
Transformer Oil Sampling Points: Procurement Guide
25 Oct 2026

Transformer Oil Sampling Points: Procurement Guide

Transformer oil sampling points need more than a valve line item. Agree point identity, fluid source, access, connection details and laboratory-equipment res...

Read the guide
Transformer Neutral Grounding: NGR Supply Scope
25 Oct 2026

Transformer Neutral Grounding: NGR Supply Scope

For transformer neutral grounding with an external resistor, agree the neutral-terminal details, supply boundaries and coordinated drawings before accepting ...

Read the guide
Pad-Mounted Transformer Foundation Openings
25 Oct 2026

Pad-Mounted Transformer Foundation Openings

Pad-mounted transformer foundation openings need a coordinated review of the proposed equipment, pad and conduit drawings. Identify the controlling revisions...

Read the guide
Transformer Dielectric Test Schedule: Winding and Terminal Coverage
25 Oct 2026

Transformer Dielectric Test Schedule: Winding and Terminal Coverage

A buyer’s guide to agreeing winding and terminal coverage in a liquid-immersed transformer dielectric test schedule, without confusing technical scope with w...

Read the guide
Transformer SFRA Baseline: Agree the Reference Before Shipping
25 Oct 2026

Transformer SFRA Baseline: Agree the Reference Before Shipping

A transformer SFRA baseline is useful only for its intended comparison. Agree the transformer condition, reference purpose, data handover and engineering rev...

Read the guide
Dry-Type Transformer Reverse Feeding: Is a Step-Up Offer Suitable?
25 Oct 2026

Dry-Type Transformer Reverse Feeding: Is a Step-Up Offer Suitable?

Dry-type transformer reverse feeding needs more than matching nameplate voltages. Separate manufacturer-supported alternatives from unresolved substitutions ...

Read the guide
Oil-Immersed Transformers for Motor Loads: Define the Starting Duty
22 Oct 2026

Oil-Immersed Transformers for Motor Loads: Define the Starting Duty

Oil-immersed transformer enquiries for motor loads need more than running-load kVA. Define the motor-start duty, supply conditions and voltage criteria so th...

Read the guide
Transformer Oil Containment: Agree the Civil Interface Before Order
22 Oct 2026

Transformer Oil Containment: Agree the Civil Interface Before Order

Transformer oil containment requires a clear equipment-to-civil handover. Confirm oil inventory, drawings, site interfaces and named responsibilities before ...

Read the guide

Compare quotations

Put the proposals
on the same basis.

A lower price is only comparable when the proposed equipment and supply scope match. Record differences and resolve them before ordering.

Equipment

Compare capacity, voltages, phase, frequency, impedance, cooling and installation requirements against the same specification.

Documents and testing

Identify the proposed model, drawings, required test reports and any mandatory approvals. Check what is included and excluded.

Commercial scope

Compare quantity, delivery term and named place, packaging, transport, lead time, payment and warranty in writing.

Prepare your enquiry

Project documents

The right document. For the right model.

Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.

01 / DOCUMENT

Datasheet and ratings

Identify the proposed model and the electrical ratings that the document must cover.

Request for your project
02 / DOCUMENT

Outline and connection drawings

State the installation, cable-entry and clearance requirements you need to check.

Request for your project
03 / DOCUMENT

Test and approval documents

Name the required tests, standard or approval, and the model or configuration concerned.

Request for your project

Request documents for your proposed configuration

Include the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.

When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.

Read the certificate-scope guideOpen the document centre

Your project / next step

Good decisions start with clear requirements.

Send the details you have. We can start the conversation while the remaining requirements are being confirmed.

Discuss your project