Skip to content
HEAKOR.
EN

Your selection takes priority. You can change it at any time.

Some product and technical content is available in English.

Request A Quote

HEAKOR / Buyer knowledge

Transformer buying,
made clearer.

Practical transformer buying guides for the decisions before a purchase.

Prepare the specification, check document scope and compare proposals on the same basis.

Choose your next task

What are you working on?

Start here / Procurement essentials

A better enquiry makes a better starting point.

Bring the electrical ratings, site conditions, destination, quantity and required documents together before requesting a quotation.

Open the transformer RFQ checklist
  1. 01Identify the equipment and application
  2. 02Define electrical and site requirements
  3. 03List documents and approval needs
  4. 04Clarify quantity, destination and timing

The guide library

Read. Check. Prepare.

Use these guides to prepare questions for your technical team and supplier. Project documents govern final selection.

Dry-Type Transformer Enclosures: Check IP and Rated Duty Together
22 Oct 2026

Dry-Type Transformer Enclosures: Check IP and Rated Duty Together

Dry-type transformer enclosures need matching IP evidence and a thermal-duty review. Confirm that the proposed drawings, cooling arrangement and rated duty d...

Read the guide
Transformer Spare Parts List: Commissioning & Operating Spares
21 Oct 2026

Transformer Spare Parts List: Commissioning & Operating Spares

A transformer spare parts list separates installation items, commissioning provisions and operating spares. Check part references, quantities, approvals, pac...

Read the guide
Transformer Auxiliary Power: Liquid-Filled Supply Scope
21 Oct 2026

Transformer Auxiliary Power: Liquid-Filled Supply Scope

Transformer auxiliary power needs a clear load list and supply boundary. Confirm fitted accessories, available AC/DC sources, incoming terminals, cable scope...

Read the guide
Transformer Oil Level Indicator: Conservator & Gauge Match
21 Oct 2026

Transformer Oil Level Indicator: Conservator & Gauge Match

A transformer oil level indicator must match its oil compartment and conservator arrangement. Review the selected model, mounting, float geometry, dial basis...

Read the guide
Split-Shipped Substation Transformers: Agree Site Reassembly Scope
20 Oct 2026

Split-Shipped Substation Transformers: Agree Site Reassembly Scope

Split-shipped substation transformer procurement requires clear site responsibilities. Use a stage-by-stage matrix to agree preparation, reassembly, supervis...

Read the guide
Transformer FAT Witness and Hold Points: Agree the Release Process
20 Oct 2026

Transformer FAT Witness and Hold Points: Agree the Release Process

Transformer FAT witness and hold points need an agreed release process. Define notice, attendance, waivers, retests, report review and shipment approval befo...

Read the guide
Substation Transformer Bushing CTs: Ratio, Burden and Terminal Scope
20 Oct 2026

Substation Transformer Bushing CTs: Ratio, Burden and Terminal Scope

Substation transformer bushing CT requirements should identify each location, core and duty. Connect ratio and burden evidence to the secondary-terminal hand...

Read the guide
Motorized DETC or OLTC? Transformer Tap-Changer Scope
19 Oct 2026

Motorized DETC or OLTC? Transformer Tap-Changer Scope

Motorized DETC and OLTC describe different tap-changing duties. Separate the changer, motor drive and controls, then use a scope matrix to confirm interfaces...

Read the guide
Removable Transformer Radiators: Interface and Supply Scope
19 Oct 2026

Removable Transformer Radiators: Interface and Supply Scope

Removable transformer radiator procurement needs a controlled drawing and clear acceptance record. Review mechanical fit, cooling-design responsibility, liqu...

Read the guide
Pad-Mounted Transformer Loop Feed: Three-Phase Switching Scope
19 Oct 2026

Pad-Mounted Transformer Loop Feed: Three-Phase Switching Scope

Pad-mounted transformer loop feed does not define the complete switching package. For a three-phase unit, compare one-line drawings, switch functions, rating...

Read the guide
Substation Transformer Conservator and Breather: Supply Scope
18 Oct 2026

Substation Transformer Conservator and Breather: Supply Scope

Substation transformer conservator and breather scope requires more than a component list. Confirm the preservation arrangement, oil-expansion basis, air sep...

Read the guide
Mineral-Oil Substation Transformer DGA: Agree the Baseline
18 Oct 2026

Mineral-Oil Substation Transformer DGA: Agree the Baseline

Mineral-oil substation transformer DGA needs an agreed baseline. Define sample stages, methods, reference records and technical review responsibilities befor...

Read the guide

Compare quotations

Put the proposals
on the same basis.

A lower price is only comparable when the proposed equipment and supply scope match. Record differences and resolve them before ordering.

Equipment

Compare capacity, voltages, phase, frequency, impedance, cooling and installation requirements against the same specification.

Documents and testing

Identify the proposed model, drawings, required test reports and any mandatory approvals. Check what is included and excluded.

Commercial scope

Compare quantity, delivery term and named place, packaging, transport, lead time, payment and warranty in writing.

Prepare your enquiry

Project documents

The right document. For the right model.

Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.

01 / DOCUMENT

Datasheet and ratings

Identify the proposed model and the electrical ratings that the document must cover.

Request for your project
02 / DOCUMENT

Outline and connection drawings

State the installation, cable-entry and clearance requirements you need to check.

Request for your project
03 / DOCUMENT

Test and approval documents

Name the required tests, standard or approval, and the model or configuration concerned.

Request for your project

Request documents for your proposed configuration

Include the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.

When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.

Read the certificate-scope guideOpen the document centre

Your project / next step

Good decisions start with clear requirements.

Send the details you have. We can start the conversation while the remaining requirements are being confirmed.

Discuss your project