Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
A three-phase oil-immersed pad-mounted transformer provides voltage transformation for three-phase distribution through a ground-level transformer installation. HEAKOR accepts enquiries for project-specific outdoor distribution applications. The electrical rating, cabinet arrangement, cable connections and site requirements must be reviewed before a configuration is confirmed.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Capacity · voltages · phase · frequency
Application · destination · quantity · schedule
Specification · drawings · required approvals
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Submit your pad-mounted transformer requirements with the required kVA, voltages and destination.
Specify the electrical system and the physical connection requirements together. A three-phase oil-immersed pad-mounted transformer must fit the intended network and installation layout; matching kVA and voltage alone is not sufficient.
The installation and connection arrangements differ: a pad-mounted transformer is installed at ground level, while a pole-mounted design is intended for an elevated support arrangement. Choose according to the network design, cable routing, site access and utility requirements.
Use the feed arrangement required by the approved network design. Radial and loop arrangements affect the primary connections and equipment layout. Provide the single-line diagram and required switching arrangement so these interfaces can be checked.
Do not assume the terminal configuration from the product name or cabinet image. State the required live-front or dead-front arrangement, connector interface and ratings. Availability and compatibility must be confirmed for the proposed transformer.
Send the required kVA, primary voltage, secondary voltage and frequency, together with the load profile. HEAKOR will need to review the requested combination before confirming a model. This page does not establish that every capacity and voltage combination is available.
No. A three-phase oil-immersed pad-mounted transformer must be assessed against the destination's product standards, efficiency requirements, certification or listing requirements and utility specification. Identify mandatory approvals and documents at the enquiry stage.
Provide the nameplate, foundation and cable-entry drawings, terminal details and available working space. Identify any changes to the load or protection arrangement. The replacement must match both the electrical requirements and installation interfaces.
Send your company name, project stage, quantity, destination and required delivery schedule with the core specifications. Mention available drawings and any required test reports. Final configuration, compliance, documents, price and delivery must be confirmed for the project.
Submit project specifications to HEAKOR. See the three-phase pad-mounted transformer category for an overview.
Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.
Before requesting a quotation
A product name or capacity is the starting point. Include these requirements so the proposal can be reviewed against your project.
Capacity, primary and secondary voltages, phase, frequency, and any specified connection, impedance or tap requirements.
Describe the feed arrangement, cable connections, cabinet access and site layout. Include the project or utility specification.
State the required drawings, tests or approvals, quantity, destination and project schedule. Identify any mandatory requirements before quotation.
Send the information you have and mark unknown items as to be confirmed. For a replacement, an existing nameplate, equipment photographs and site constraints help define the review. Final ratings and supply scope must be agreed in the quotation and approved documents.
Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project