Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
The HEAKOR 500 kVA three-phase pole-mounted transformer is listed for oil-immersed overhead distribution applications. The 500 kVA designation identifies the listed apparent-power rating; it does not by itself confirm the voltage combination, load suitability or installation arrangement for a project.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Capacity · voltages · phase · frequency
Application · destination · quantity · schedule
Specification · drawings · required approvals
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Request a quotation for your 500 kVA project with the primary and secondary voltages, frequency and installation location.
Not necessarily. kVA expresses apparent power, while kW expresses active power; the relationship depends on the load power factor. Provide the load profile and any motor-starting or other special load requirements for engineering review.
No. The proposed support structure, mounting details, equipment weight and site requirements must be checked for the installation. A 500 kVA three-phase pole-mounted transformer must not be selected on the assumption that an existing pole or support is adequate.
This listing does not confirm a fixed voltage combination. State both voltages, the system frequency, winding connection and neutral requirements in your enquiry. The proposed configuration must be confirmed in the technical specification.
An equal kVA rating alone is insufficient. Compare voltage ratio, frequency, vector group, impedance, insulation requirements, terminals and mounting details. Send the existing nameplate and drawings, and identify any changes to the load or site.
Approval cannot be inferred from the product name. Provide the utility specification, required standards and certification requirements so compliance can be reviewed for the exact design. Any test reports and approval documents included in the order must be identified in writing.
Provide the electrical requirements, installation details, quantity, destination and requested delivery date. Include the project stage and required documents. HEAKOR will review the enquiry before confirming the supply scope, price and delivery.
Use the contact form to send the core requirements and mention any available specification, nameplate or drawings. Mark undecided parameters as TBC so they can be identified during review.
Submit your 500 kVA transformer requirements. See the three-phase pole-mounted transformer category for an overview.
Before requesting a quotation
A product name or capacity is the starting point. Include these requirements so the proposal can be reviewed against your project.
Capacity, primary and secondary voltages, phase, frequency, and any specified connection, impedance or tap requirements.
Provide the mounting arrangement, connection requirements and serving utility specification. Include site constraints.
State the required drawings, tests or approvals, quantity, destination and project schedule. Identify any mandatory requirements before quotation.
Send the information you have and mark unknown items as to be confirmed. For a replacement, an existing nameplate, equipment photographs and site constraints help define the review. Final ratings and supply scope must be agreed in the quotation and approved documents.
Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project