Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
The HEAKOR 30 kVA three-phase pole-mounted transformer is listed as an oil-immersed design for outdoor overhead distribution enquiries. This page identifies the 30 kVA, three-phase product and the information needed to review a proposed configuration. Final suitability depends on the project load, electrical system, utility requirements and installation conditions.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Capacity · voltages · phase · frequency
Application · destination · quantity · schedule
Specification · drawings · required approvals
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Request a 30 kVA three-phase transformer quotation with your voltages, quantity and destination.
The checklist identifies requirements to confirm; it does not establish fixed values or included options. Specify the applicable standard, edition and utility requirements for the destination. Any certification or approval must be checked for the exact proposed design.
For a 30 kVA three-phase enquiry, state the required equipment arrangement and include the project single-line diagram where available. Identify winding connections, neutral requirements and installation interfaces. This makes the enquiry easier to compare with the intended distribution design.
Mark the vector group as TBC and identify who will approve the system connections. Provide the utility or project specification and any existing equipment details. Do not select a connection arrangement solely from a product photograph or capacity label.
Send your company name, project stage, quantity, destination and requested delivery date with the technical requirements. Mention available specifications, drawings or nameplate records so HEAKOR can arrange how to receive them. Final configuration, documents, tests, price and delivery require confirmation in the agreed quotation.
Use the enquiry form to share the requirements you have and mark open values as TBC. Identify any mandatory documents or approval steps before requesting a firm offer.
Submit Your Project Requirements. For the family overview, browse three-phase pole-mounted transformers.
Before requesting a quotation
A product name or capacity is the starting point. Include these requirements so the proposal can be reviewed against your project.
Capacity, primary and secondary voltages, phase, frequency, and any specified connection, impedance or tap requirements.
Provide the mounting arrangement, connection requirements and serving utility specification. Include site constraints.
State the required drawings, tests or approvals, quantity, destination and project schedule. Identify any mandatory requirements before quotation.
Send the information you have and mark unknown items as to be confirmed. For a replacement, an existing nameplate, equipment photographs and site constraints help define the review. Final ratings and supply scope must be agreed in the quotation and approved documents.
Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project