Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
The HEAKOR 25 kVA single-phase pole-mounted transformer is listed as an oil-immersed design for outdoor overhead distribution enquiries. This page identifies the 25 kVA, single-phase product and the information needed to review a proposed configuration. Final suitability depends on the project load, electrical system, utility requirements and installation conditions.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Request a 25 kVA single-phase transformer quotation with your voltages, quantity and destination.
The checklist identifies requirements to confirm; it does not establish fixed values or included options. Specify the applicable standard, edition and utility requirements for the destination. Any certification or approval must be checked for the exact proposed design.
For a replacement enquiry, provide the existing 25 kVA nameplate details and describe any changes to the load or service arrangement. Include the required voltage ratio, terminal layout and mounting constraints so the proposed equipment can be compared against the installation.
No. The rated capacity identifies only part of the requirement. The voltage ratio, frequency, connections, insulation requirements, protection and physical interfaces still need review. Record any differences between the existing equipment and the requested replacement.
Send your company name, project stage, quantity, destination and requested delivery date with the technical requirements. Mention available specifications, drawings or nameplate records so HEAKOR can arrange how to receive them. Final configuration, documents, tests, price and delivery require confirmation in the agreed quotation.
Use the enquiry form to share the requirements you have and mark open values as TBC. Identify any mandatory documents or approval steps before requesting a firm offer.
Submit Your Project Requirements. For the family overview, browse single-phase pole-mounted transformers.
Review the single-phase pole-mounted series, or include your required rating and project details in an enquiry.
View the capacity range ↗Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project