Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
Enquire about the 25 kVA Single-Phase Pad-Mounted Transformer with HEAKOR for underground electrical distribution applications serving residential, commercial and utility projects.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Capacity · voltages · phase · frequency
Application · destination · quantity · schedule
Specification · drawings · required approvals
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Each transformer is configured according to the approved project specification. Primary voltage, secondary voltage, feed arrangement, insulation level, tap requirements, accessories and applicable standards must be confirmed before quotation and production.
Provide the required voltage ratings and configuration details for engineering review before quotation and production.
This transformer is intended for step-down distribution from an underground primary cable system to single-phase residential, commercial or utility loads.
The final application suitability depends on the system voltage, load requirements, installation environment, applicable utility specification and local regulatory requirements.
Please provide:
Share the existing nameplate details, required voltage ratio, cable entry arrangement, and available pad or enclosure drawing. The same kVA rating alone does not confirm that a replacement will match the existing installation.
The voltage ratio, BIL, tap arrangement, terminal configuration, enclosure, insulating liquid, protection requirements, accessories and applicable standard will be reviewed for each project.
The product image illustrates this transformer family. Final enclosure dimensions and terminal layout must follow the approved project drawing.
Request a technical quotation with your specification, quantity and destination. For other ratings, view the single-phase pad-mounted transformer collection.
Before requesting a quotation
A product name or capacity is the starting point. Include these requirements so the proposal can be reviewed against your project.
Capacity, primary and secondary voltages, phase, frequency, and any specified connection, impedance or tap requirements.
Describe the feed arrangement, cable connections, cabinet access and site layout. Include the project or utility specification.
State the required drawings, tests or approvals, quantity, destination and project schedule. Identify any mandatory requirements before quotation.
Send the information you have and mark unknown items as to be confirmed. For a replacement, an existing nameplate, equipment photographs and site constraints help define the review. Final ratings and supply scope must be agreed in the quotation and approved documents.
Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project