Datasheet and ratings
Identify the proposed model and the electrical ratings that the document must cover.
Request for your project
Product image for reference. Confirm the proposed configuration and drawing for your project.
HEAKOR / Transformer enquiries
The HEAKOR 200 kVA three-phase pole-mounted transformer is listed as an oil-immersed design for overhead distribution projects. For a project specifying 200 kVA, provide both the electrical ratings and the operating load information. The listed capacity does not establish suitability for a particular motor, process or combination of loads.
These details identify the listed product. The approved specification and drawing define the equipment supplied.
Capacity · voltages · phase · frequency
Application · destination · quantity · schedule
Specification · drawings · required approvals
Specifications, standards, certification scope and commercial terms are confirmed for the proposed equipment and project.
Submit your 200 kVA project requirements for technical review and quotation.
For a 200 kVA three-phase pole-mounted transformer, confirm the following before finalizing the order:
Provide the connected loads and their expected operating pattern, including which loads run together. Identify motor-starting arrangements and any special equipment requirements. A capacity label alone is insufficient for engineering selection.
Describe the existing load and the planned additions separately, with their expected timing and operating conditions. Request review of the complete design requirement rather than assuming a fixed spare-capacity percentage is suitable.
Confirm primary and secondary voltages, frequency, winding connection, neutral requirements and impedance. Include insulation levels, taps and protection requirements from the project specification. Mark values still under review as TBC.
No. Compliance and approval must be established for the exact proposed design and destination. Identify mandatory certificates, test documentation and utility requirements at the enquiry stage; none should be assumed from the capacity or product category.
Send HEAKOR your company name, project stage, quantity, destination and requested delivery schedule with the technical requirements. Final configuration, documents, tests, price and delivery need written confirmation.
Request a 200 kVA transformer quotation. For the family overview, see three-phase pole-mounted transformers.
Before requesting a quotation
A product name or capacity is the starting point. Include these requirements so the proposal can be reviewed against your project.
Capacity, primary and secondary voltages, phase, frequency, and any specified connection, impedance or tap requirements.
Provide the mounting arrangement, connection requirements and serving utility specification. Include site constraints.
State the required drawings, tests or approvals, quantity, destination and project schedule. Identify any mandatory requirements before quotation.
Send the information you have and mark unknown items as to be confirmed. For a replacement, an existing nameplate, equipment photographs and site constraints help define the review. Final ratings and supply scope must be agreed in the quotation and approved documents.
Project documents
Tell us which documents your project needs. Availability and applicable scope are confirmed for the proposed model and configuration.
Identify the proposed model and the electrical ratings that the document must cover.
Request for your projectState the installation, cable-entry and clearance requirements you need to check.
Request for your projectName the required tests, standard or approval, and the model or configuration concerned.
Request for your projectInclude the model or product type, capacity, voltages, frequency and destination. Ask for the report number, date and test scope so you can check that the documents match the proposed configuration. An individual report does not establish certification for every model or destination.
When reviewing a document, match the legal entity, model, rating, applicable scope and issue date to your proposed equipment.
Read the certificate-scope guideOpen the document centreYour project / next step
Send the details you have. We can start the conversation while the remaining requirements are being confirmed.
Discuss your project