Saltar al contenido
HEAKOR.
ES

Su selección tiene prioridad. Puede cambiarla en cualquier momento.

Parte del contenido técnico y del producto está disponible en inglés.

Solicitar cotización

Gama de transformadores

Single-Phase Pole-Mounted Transformers

Revise los productos enumerados, luego envíe sus requisitos eléctricos, condiciones del sitio y destino para una cotización específica del proyecto.

Hablemos de esta gama

Single-Phase Pole-Mounted Transformers

This collection covers HEAKOR single-phase pole-mounted transformer pages for outdoor overhead distribution applications. Current product pages are organized by 10, 15, 25, 37.5, 50, 75, 100, and 167 kVA ratings.

Final selection depends on the project load, primary and secondary voltage, frequency, utility construction requirements, insulation level, tap arrangement, terminals, protection, accessories, and installation environment.

Information Required for Selection

  • Rated power and expected load
  • Primary and secondary voltage
  • Frequency and grounding arrangement
  • Required BIL and tap range
  • Bushing and terminal configuration
  • Protection devices and accessories
  • Applicable utility or project standard
  • Ambient temperature, altitude, and site conditions
  • Quantity and destination country

Send the technical specification or single-line diagram for review. The approved datasheet and purchase documents control the final configuration.

Prepare Your Project Enquiry

For replacement equipment, mention any existing nameplate, connection diagram and pole mounting restrictions. Include the intended application and explain whether the request is for preliminary budgeting, tender preparation or a planned purchase. This helps identify which requirements are ready for review and which remain open.

For single-phase pole-mounted transformer enquiries, send your project requirements with company name, quantity, destination and required delivery schedule. Mention available drawings so we can arrange how to receive them. Final specifications, documentation, price and delivery terms require confirmation in the agreed quotation.

Su proyecto / siguiente paso

Las buenas decisiones comienzan con requisitos claros.

Envíe los datos que tiene. Podemos iniciar la conversación mientras se confirman los requisitos restantes.

Hablemos de su proyecto