跳至內容
HEAKOR.
ZH-TW

您的選擇優先。您可以隨時更改它。

一些產品和技術內容有英文版本。

索取報價

HEAKOR / 變壓器詢盤

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

列出的產品信息

產品類型
變電站

這些信息用于識別所列產品。實際供貨設備以批準的技術規格及圖紙為準。

根據項目要求報價
索取項目報價閱讀產品信息開啟資料中心
電氣

容量·電壓·相數·頻率

項目

用途 · 目的地 · 數量 · 計劃

文件

規格·圖紙·所需批準

技術規格、標準、認證范圍及商務條款將針對擬供設備和項目確認。

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

申請報價之前

核對是否適合您的項目。

產品名稱或容量只是起點。提供這些要求,以便根據項目審核方案。

01

電氣要求

容量、一次及二次電壓、相數、頻率,以及規定的聯結方式、阻抗或分接要求。

02

安裝要求

提供系統規格、場地布置、安裝限制和設備接口。

03

文件及供貨范圍

說明所需的圖紙、測試或批準、數量、目的地和項目進度表。在報價前確定任何強制性要求。

如果某些規格尚不清楚怎么辦?

提供您已有的信息,將未知事項標注為待確認。設備更換時,現有銘牌、設備照片及現場限制有助于明確核對內容。最終額定參數及供貨范圍必須在報價和批準文件中達成一致。

討論該產品

項目文件

資料準確,型號對應。

告訴我們項目需要哪些資料。資料可提供性及適用范圍將針對擬供型號和配置確認。

索取擬供配置的資料

提供型號或產品類型、容量、電壓、頻率及目的地。索取報告編號、日期和試驗范圍,以核對資料與擬供配置是否一致。一份報告不能證明所有型號或目的地均取得認證。

審核資料時,請核對公司主體、型號、額定參數、適用范圍和簽發日期是否對應擬供設備。

閱讀證書范圍指南開啟資料中心

您的項目/下一步

好的決策始于明確的要求。

發送您所掌握的詳細信息。我們可以在確認其余要求的同時開始對話。

討論您的項目