参数表及额定参数
明确拟供型号及资料需要覆盖的电气额定参数。
针对您的项目发送需求
产品图片供参考。确认您的项目的建议配置和图纸。
HEAKOR / 变压器询盘
An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.
这些信息用于识别所列产品。实际供货设备以批准的技术规格及图纸为准。
容量·电压·相数·频率
用途 · 目的地 · 数量 · 计划
规格·图纸·所需批准
技术规格、标准、认证范围及商务条款将针对拟供设备和项目确认。
Submit your substation transformer requirements with the required rating, voltages and project destination.
For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.
No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.
State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.
Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.
Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.
Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.
Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.
Submit project specifications to HEAKOR. For the category overview, see substation transformers.
Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.
申请报价之前
产品名称或容量只是起点。提供这些要求,以便根据项目审核方案。
容量、一次及二次电压、相数、频率,以及规定的联结方式、阻抗或分接要求。
提供系统规格、场地布置、安装限制和设备接口。
说明所需的图纸、测试或批准、数量、目的地和项目进度表。在报价前确定任何强制性要求。
提供您已有的信息,将未知事项标注为待确认。设备更换时,现有铭牌、设备照片及现场限制有助于明确核对内容。最终额定参数及供货范围必须在报价和批准文件中达成一致。
项目文件
告诉我们项目需要哪些资料。资料可提供性及适用范围将针对拟供型号和配置确认。
明确拟供型号及资料需要覆盖的电气额定参数。
针对您的项目发送需求说明您需要检查的安装、电缆入口和间隙要求。
针对您的项目发送需求列出所需的测试、标准或批准,以及相关的型号或配置。
针对您的项目发送需求您的项目/下一步
发送您所掌握的详细信息。我们可以在确认其余要求的同时开始对话。
讨论您的项目