Three-Phase Oil-Immersed Pad-Mounted Transformer

A three-phase oil-immersed pad-mounted transformer provides voltage transformation for three-phase distribution through a ground-level transformer installation. HEAKOR accepts enquiries for project-specific outdoor distribution applications. The electrical rating, cabinet arrangement, cable connections and site requirements must be reviewed before a configuration is confirmed.

Listelenen ürün bilgileri

Ürün türü
Ped monteli
Faz sayısı
Üç fazlı

Bu ayrıntılar listelenen ürünü tanımlar. Onaylanan spesifikasyon ve çizim, tedarik edilen ekipmanı tanımlar.

Proje gereksinimlerine dayalı teklif
Proje teklifi isteyinÜrün bilgilerini okuyunBelge merkezini açın
Elektrik

anma gücü · gerilimler · faz · frekans

Projesi

Uygulama · hedef · miktar · program

Belgeler

Şartname · çizimler · gerekli onaylar

Spesifikasyonlar, standartlar, sertifikasyon kapsamı ve ticari koşullar, önerilen ekipman ve proje için teyit edilir.

Submit your pad-mounted transformer requirements with the required kVA, voltages and destination.

What information is needed for selection?

Specify the electrical system and the physical connection requirements together. A three-phase oil-immersed pad-mounted transformer must fit the intended network and installation layout; matching kVA and voltage alone is not sufficient.

  • Electrical ratings: capacity, primary and secondary voltages, frequency, vector group and neutral arrangement.
  • System requirements: impedance, insulation level or BIL, taps, load profile and applicable loss or efficiency limits.
  • Cable interfaces: radial or loop feed, terminal arrangement, connector requirements and cable-entry layout.
  • Equipment scope: protection, switching, monitoring and accessories required by the project.
  • Installation: ambient conditions, altitude, enclosure requirements, foundation layout and access constraints.

Pad-mounted transformer questions and answers

How is this different from a pole-mounted transformer?

The installation and connection arrangements differ: a pad-mounted transformer is installed at ground level, while a pole-mounted design is intended for an elevated support arrangement. Choose according to the network design, cable routing, site access and utility requirements.

Should I specify radial feed or loop feed?

Use the feed arrangement required by the approved network design. Radial and loop arrangements affect the primary connections and equipment layout. Provide the single-line diagram and required switching arrangement so these interfaces can be checked.

Are dead-front connections included?

Do not assume the terminal configuration from the product name or cabinet image. State the required live-front or dead-front arrangement, connector interface and ratings. Availability and compatibility must be confirmed for the proposed transformer.

What capacity and voltage combinations can I request?

Send the required kVA, primary voltage, secondary voltage and frequency, together with the load profile. HEAKOR will need to review the requested combination before confirming a model. This page does not establish that every capacity and voltage combination is available.

Does the product name prove utility approval?

No. A three-phase oil-immersed pad-mounted transformer must be assessed against the destination's product standards, efficiency requirements, certification or listing requirements and utility specification. Identify mandatory approvals and documents at the enquiry stage.

What should I check when replacing an existing unit?

Provide the nameplate, foundation and cable-entry drawings, terminal details and available working space. Identify any changes to the load or protection arrangement. The replacement must match both the electrical requirements and installation interfaces.

Request a three-phase oil-immersed pad-mounted transformer quotation

Send your company name, project stage, quantity, destination and required delivery schedule with the core specifications. Mention available drawings and any required test reports. Final configuration, compliance, documents, price and delivery must be confirmed for the project.

Submit project specifications to HEAKOR. See the three-phase pad-mounted transformer category for an overview.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

Teklif istemeden önce

Projenize uygunluğu onaylayın.

Bir ürün adı veya anma gücü başlangıç noktasıdır. Teklifin projenize göre incelenebilmesi için bu gereksinimleri ekleyin.

01

Elektrik gereksinimleri

Güç, primer ve sekonder gerilimler, faz sayısı, frekans ve belirtilen bağlantı, empedans veya kademe gereksinimleri.

02

Kurulum gereksinimleri

Besleme düzenlemesini, kablo bağlantılarını, kabin erişimini ve saha düzenini açıklayın. Proje veya elektrik şebekesi operatörü spesifikasyonunu ekleyin.

03

Belgeler ve tedarik kapsamı

Gerekli çizimleri, testleri veya onayları, miktarı, hedefi ve proje programını belirtin. Teklif vermeden önce zorunlu gereksinimleri belirleyin.

Bazı özellikler henüz bilinmiyorsa ne olur?

Elinizdeki bilgileri gönderin ve bilinmeyen öğeleri onaylanacak şekilde işaretleyin. Değiştirme için mevcut bir isim plakası, ekipman fotoğrafları ve saha kısıtlamaları incelemenin tanımlanmasına yardımcı olur. Nihai anma elektrik değerleri ve tedarik kapsamı, teklifte ve onaylanmış belgelerde kararlaştırılmalıdır.

Bu ürünü tartışın

Proje belgeleri

Doğru belge. Doğru model için.

Projenizin ihtiyaç duyduğu belgeleri belirtin. Mevcudiyet ve geçerli kapsam, önerilen model ve konfigürasyon için teyit edilir.

01 / BELGE

Veri sayfası ve anma değerleri

Önerilen modeli ve belgenin kapsaması gereken elektriksel anma elektrik değerlerini tanımlayın.

Projeniz için istek
02 / BELGE

Genel ölçü ve bağlantı çizimleri

Kontrol etmeniz gereken kurulum, kablo girişi ve açıklık gereksinimlerini belirtin.

Projeniz için istek
03 / BELGE

Test ve onay belgeleri

Gerekli testleri, standardı veya onayı ve ilgili modeli veya konfigürasyonu belirtin.

Projeniz için istek

Önerilen konfigürasyonunuz için doküman isteyin

Modeli veya ürün tipini, anma gücü, voltajları, frekansı ve hedefi ekleyin. Belgelerin önerilen konfigürasyonla eşleştiğini kontrol edebilmek için rapor numarasını, tarihini ve test kapsamını isteyin. Bireysel bir rapor her model veya hedef için sertifikasyon sağlamaz.

Bir belgeyi incelerken tüzel kişiliği, modeli, anma elektrik değerini, geçerli kapsamı ve yayın tarihini önerilen ekipmanınızla eşleştirin.

Sertifika kapsamı kılavuzunu okuyunBelge merkezini açın

Projeniz / sonraki adım

İyi kararlar net gerekliliklerle başlar.

Elinizdeki ayrıntıları gönderin. Kalan gereksinimler onaylanırken konuşmaya başlayabiliriz.

Projenizi tartışın