İçeriğe atla
HEAKOR.
TR

Seçiminiz önceliklidir. İstediğiniz zaman değiştirebilirsiniz.

Bazı ürün ve teknik içerik İngilizce olarak mevcuttur.

Fiyat teklifi isteyin

HEAKOR / Transformatör sorguları

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

Listelenen ürün bilgileri

Ürün türü
Trafo Merkezi

Bu ayrıntılar listelenen ürünü tanımlar. Onaylanan spesifikasyon ve çizim, tedarik edilen ekipmanı tanımlar.

Proje gereksinimlerine dayalı teklif
Proje teklifi isteyinÜrün bilgilerini okuyunBelge merkezini açın
Elektrik

anma gücü · gerilimler · faz · frekans

Projesi

Uygulama · hedef · miktar · program

Belgeler

Şartname · çizimler · gerekli onaylar

Spesifikasyonlar, standartlar, sertifikasyon kapsamı ve ticari koşullar, önerilen ekipman ve proje için teyit edilir.

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

Teklif istemeden önce

Projenize uygunluğu onaylayın.

Bir ürün adı veya anma gücü başlangıç noktasıdır. Teklifin projenize göre incelenebilmesi için bu gereksinimleri ekleyin.

01

Elektrik gereksinimleri

Güç, primer ve sekonder gerilimler, faz sayısı, frekans ve belirtilen bağlantı, empedans veya kademe gereksinimleri.

02

Kurulum gereksinimleri

Sistem özelliklerini, saha düzenini, kurulum kısıtlamalarını ve ekipman arayüzlerini sağlayın.

03

Belgeler ve tedarik kapsamı

Gerekli çizimleri, testleri veya onayları, miktarı, hedefi ve proje programını belirtin. Teklif vermeden önce zorunlu gereksinimleri belirleyin.

Bazı özellikler henüz bilinmiyorsa ne olur?

Elinizdeki bilgileri gönderin ve bilinmeyen öğeleri onaylanacak şekilde işaretleyin. Değiştirme için mevcut bir isim plakası, ekipman fotoğrafları ve saha kısıtlamaları incelemenin tanımlanmasına yardımcı olur. Nihai anma elektrik değerleri ve tedarik kapsamı, teklifte ve onaylanmış belgelerde kararlaştırılmalıdır.

Bu ürünü tartışın

Proje belgeleri

Doğru belge. Doğru model için.

Projenizin ihtiyaç duyduğu belgeleri belirtin. Mevcudiyet ve geçerli kapsam, önerilen model ve konfigürasyon için teyit edilir.

01 / BELGE

Veri sayfası ve anma değerleri

Önerilen modeli ve belgenin kapsaması gereken elektriksel anma elektrik değerlerini tanımlayın.

Projeniz için istek
02 / BELGE

Genel ölçü ve bağlantı çizimleri

Kontrol etmeniz gereken kurulum, kablo girişi ve açıklık gereksinimlerini belirtin.

Projeniz için istek
03 / BELGE

Test ve onay belgeleri

Gerekli testleri, standardı veya onayı ve ilgili modeli veya konfigürasyonu belirtin.

Projeniz için istek

Önerilen konfigürasyonunuz için doküman isteyin

Modeli veya ürün tipini, anma gücü, voltajları, frekansı ve hedefi ekleyin. Belgelerin önerilen konfigürasyonla eşleştiğini kontrol edebilmek için rapor numarasını, tarihini ve test kapsamını isteyin. Bireysel bir rapor her model veya hedef için sertifikasyon sağlamaz.

Bir belgeyi incelerken tüzel kişiliği, modeli, anma elektrik değerini, geçerli kapsamı ve yayın tarihini önerilen ekipmanınızla eşleştirin.

Sertifika kapsamı kılavuzunu okuyunBelge merkezini açın

Projeniz / sonraki adım

İyi kararlar net gerekliliklerle başlar.

Elinizdeki ayrıntıları gönderin. Kalan gereksinimler onaylanırken konuşmaya başlayabiliriz.

Projenizi tartışın