Langkau ke kandungan
HEAKOR.
MS

Pilihan anda diutamakan. Anda boleh menukarnya pada bila-bila masa.

Sesetengah produk dan kandungan teknikal tersedia dalam bahasa Inggeris.

Minta sebut harga

pertanyaan HEAKOR / Transformer

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

Maklumat produk tersenarai

Jenis produk
Pencawang

Butiran ini mengenal pasti produk tersenarai. Spesifikasi dan lukisan yang diluluskan mentakrifkan peralatan yang dibekalkan.

Sebutharga berdasarkan keperluan projek
Minta sebut harga projekBaca maklumat produkBuka pusat dokumen
Elektrik

kuasa terkadar · voltan · fasa · frekuensi

Projek

Permohonan · destinasi · kuantiti · jadual

Dokumen

Spesifikasi · lukisan · kelulusan yang diperlukan

Spesifikasi, piawaian, skop pensijilan dan terma komersial perlu disahkan untuk peralatan dan projek yang dicadangkan.

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

Sebelum meminta sebut harga

Sahkan kesesuaian untuk projek anda.

Nama produk atau kuasa terkadar ialah titik permulaan. Sertakan keperluan ini supaya cadangan boleh disemak terhadap projek anda.

01

Keperluan elektrik

Kuasa, voltan primer dan sekunder, bilangan fasa, frekuensi serta keperluan sambungan, impedans atau tap yang dinyatakan.

02

Keperluan pemasangan

Sediakan spesifikasi sistem, susun atur tapak, kekangan pemasangan dan antara muka peralatan.

03

Dokumen dan skop bekalan

Nyatakan lukisan, ujian atau kelulusan, kuantiti, destinasi dan jadual projek yang diperlukan. Kenal pasti sebarang keperluan wajib sebelum sebut harga.

Bagaimana jika beberapa spesifikasi belum diketahui lagi?

Hantar maklumat yang anda miliki dan tandai item yang tidak diketahui sebagai disahkan. Untuk penggantian, papan nama sedia ada, gambar peralatan dan kekangan tapak membantu menentukan semakan. Nilai elektrik berkadar akhir dan skop bekalan mesti dipersetujui dalam sebut harga dan dokumen yang diluluskan.

Bincangkan produk ini

Dokumen projek

Dokumen yang betul. Untuk model yang betul.

Nyatakan dokumen yang diperlukan oleh projek anda. Ketersediaan dan skop yang terpakai disemak untuk model dan konfigurasi yang dicadangkan.

01 / DOKUMEN

Helaian data dan nilai terkadar

Kenal pasti model yang dicadangkan dan nilai elektrik terkadar yang mesti dilindungi oleh dokumen.

Permintaan untuk projek anda
02 / DOKUMEN

Lukisan dimensi keseluruhan dan sambungan elektrik

Nyatakan keperluan pemasangan, kemasukan kabel dan kelegaan yang perlu anda periksa.

Permintaan untuk projek anda
03 / DOKUMEN

Dokumen ujian dan kelulusan

Namakan ujian, standard atau kelulusan yang diperlukan dan model atau konfigurasi yang berkenaan.

Permintaan untuk projek anda

Minta dokumen untuk konfigurasi cadangan anda

Sertakan model atau jenis produk, kuasa terkadar, voltan, frekuensi dan destinasi. Minta nombor laporan, tarikh dan skop ujian supaya anda boleh menyemak sama ada dokumen sepadan dengan konfigurasi yang dicadangkan. Laporan individu tidak menetapkan pensijilan untuk setiap model atau destinasi.

Apabila menyemak dokumen, padankan entiti undang-undang, model, nilai elektrik terkadar, skop yang berkenaan dan tarikh pengeluaran dengan peralatan yang dicadangkan anda.

Baca panduan skop sijilBuka pusat dokumen

Projek anda / langkah seterusnya

Keputusan yang baik bermula dengan keperluan yang jelas.

Hantar butiran yang anda ada. Kita boleh memulakan perbualan sementara keperluan yang selebihnya sedang disahkan.

Bincangkan projek anda