콘텐츠로 건너뛰기
HEAKOR.
KO

선택한 언어가 우선 적용되며 언제든 변경할 수 있습니다.

일부 제품 및 기술 콘텐츠는 영어로 제공됩니다.

견적 요청

HEAKOR / 변압기 문의

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

나열된 제품 정보

제품 유형
변전소

이 정보는 등록된 제품을 식별하기 위한 것입니다. 실제 공급 장비는 승인된 사양과 도면으로 정합니다.

프로젝트 요구사항에 따른 견적
프로젝트 견적 요청제품 정보 읽기자료 센터 열기
전기

용량 · 전압 · 상수 · 주파수

프로젝트

신청·대상·수량·일정

문서

사양 · 도면 · 필수 승인

사양, 표준, 인증 범위 및 거래 조건은 제안 장비와 프로젝트별로 확인합니다.

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

견적을 요청하기 전에

귀하의 프로젝트에 적합한지 확인하세요.

제품명이나 용량이 출발점입니다. 제안서를 프로젝트와 비교하여 검토할 수 있도록 이러한 요구 사항을 포함하세요.

01

전기적 요구사항

용량, 1차 및 2차 전압, 상수, 주파수와 지정된 결선, 임피던스 또는 탭 요구 사항.

02

설치 요구 사항

시스템 사양, 현장 레이아웃, 설치 제약 조건 및 장비 인터페이스를 제공합니다.

03

문서 및 공급 범위

필요한 도면, 시험 또는 승인, 수량, 대상 및 프로젝트 일정을 명시하십시오. 견적을 내기 전에 필수 요구 사항을 확인하십시오.

일부 사양이 아직 알려지지 않은 경우 어떻게 되나요?

보유한 정보를 보내고, 모르는 항목은 '확인 필요'로 표시하세요. 교체 시 기존 명판, 장비 사진 및 현장 제약 조건이 검토 범위를 정하는 데 도움이 됩니다. 최종 정격과 공급 범위는 견적서와 승인 문서에서 합의해야 합니다.

이 제품에 대해 토론하세요

프로젝트 문서

올바른 문서. 올바른 모델을 위해.

프로젝트에 필요한 자료를 알려 주세요. 제공 가능 여부와 적용 범위는 제안 모델 및 구성별로 확인합니다.

01 / 문서

데이터시트 및 평가

제안된 모델과 문서에서 다루어야 하는 전기 정격을 식별합니다.

프로젝트 요청
02 / 문서

개요 및 연결 도면

확인해야 할 설치, 케이블 입구 및 공간 요구 사항을 명시하십시오.

프로젝트 요청
03 / 문서

시험 및 승인 문서

필요한 시험, 표준 또는 승인, 관련 모델 또는 구성의 이름을 지정합니다.

프로젝트 요청

제안된 구성에 대한 문서 요청

모델 또는 제품 유형, 용량, 전압, 주파수 및 목적지를 알려 주세요. 자료가 제안 구성과 일치하는지 확인할 수 있도록 보고서 번호, 날짜 및 시험 범위를 요청하세요. 개별 보고서는 모든 모델이나 목적지의 인증을 증명하지 않습니다.

자료를 검토할 때 법인, 모델, 정격, 적용 범위 및 발행일이 제안 장비와 일치하는지 확인하세요.

인증서 범위 가이드 읽기자료 센터 열기

귀하의 프로젝트 / 다음 단계

좋은 결정은 명확한 요구사항에서 시작됩니다.

가지고 있는 세부 정보를 보내세요. 나머지 요구 사항이 확인되는 동안 대화를 시작할 수 있습니다.

프로젝트에 대해 토론하세요