データシートと定格
提案されたモデルと、文書でカバーする必要がある電気定格を特定します。
あなたのプロジェクトのリクエスト
商品画像は参考です。プロジェクトの提案された構成と図面を確認します。
HEAKOR / 変圧器のお問い合わせ
An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.
これらの情報は掲載製品を識別するためのものです。供給する機器は、承認された仕様と図面で定義します。
容量・電圧・相数・周波数
申込・送付先・数量・日程
仕様・図面・必要な承認
仕様、規格、認証範囲、取引条件は、提案する機器とプロジェクトごとに確認します。
Submit your substation transformer requirements with the required rating, voltages and project destination.
For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.
No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.
State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.
Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.
Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.
Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.
Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.
Submit project specifications to HEAKOR. For the category overview, see substation transformers.
Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.
お見積りを依頼する前に
製品名または容量が出発点です。プロジェクトに照らして提案をレビューできるように、これらの要件を含めてください。
容量、一次・二次電圧、相数、周波数、および指定された結線、インピーダンス、タップの要件。
システムの仕様、サイトのレイアウト、設置上の制約、および機器のインターフェイスを提供します。
必要な図面、試験または承認、数量、目的地、プロジェクトのスケジュールを記載します。見積もりの前に必須要件を特定します。
お持ちの情報を送り、不明な項目は「要確認」としてください。交換の場合は、既存の銘板、機器写真、現場の制約が確認内容を明確にする助けになります。最終定格と供給範囲は、見積書と承認済み資料で合意する必要があります。
プロジェクト文書
プロジェクトに必要な資料をお知らせください。提供可否と適用範囲は、提案する型式と構成ごとに確認します。
提案されたモデルと、文書でカバーする必要がある電気定格を特定します。
あなたのプロジェクトのリクエスト確認する必要がある取り付け、ケーブル挿入口、およびクリアランスの要件を述べます。
あなたのプロジェクトのリクエスト必要な試験、規格または承認、および関連するモデルまたは構成の名前を指定します。
あなたのプロジェクトのリクエスト型式または製品種類、容量、電圧、周波数、仕向地を記載してください。資料が提案構成と一致するか確認できるよう、報告番号、日付、試験範囲を求めてください。単独の報告書は、すべての型式や仕向地の認証を証明するものではありません。
資料を確認する際は、法人、型式、定格、適用範囲、発行日が提案する機器と一致するか照合してください。
証明書の範囲ガイドを読む資料センターを開くあなたのプロジェクト / 次のステップ
あなたが持っている詳細を送信してください。残りの要件を確認しながら会話を開始できます。
プロジェクトについて話し合う