Vai al contenuto
HEAKOR.
IT

La tua selezione ha la priorità. Puoi modificarla in qualsiasi momento.

Alcuni contenuti di prodotto e tecnici sono disponibili in inglese.

Richiedi un preventivo

HEAKOR / Richieste trasformatore

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

Informazioni sul prodotto elencate

Tipologia prodotto
Sottostazione

Questi dettagli identificano il prodotto elencato. Le specifiche e i disegni approvati definiscono l'attrezzatura fornita.

Preventivo basato sui requisiti del progetto
Richiedi un preventivo di progettoLeggi le informazioni sul prodottoAprire il centro documentazione
Elettrico

Potenza nominale · tensioni · fase · frequenza

Progetto

Applicazione · destinazione · quantità · pianificazione

Documenti

Specifiche · disegni · approvazioni richieste

Le specifiche, gli standard, l'ambito di certificazione e i termini commerciali sono confermati per l'attrezzatura e il progetto proposti.

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

Prima di richiedere un preventivo

Conferma l'idoneità per il tuo progetto.

Il nome del prodotto o la potenza nominale è il punto di partenza. Includi questi requisiti in modo che la proposta possa essere esaminata rispetto al tuo progetto.

01

Requisiti elettrici

Potenza, tensioni primaria e secondaria, numero di fasi, frequenza ed eventuali requisiti specificati di collegamento, impedenza o prese di regolazione.

02

Requisiti di installazione

Fornire le specifiche del sistema, il layout del sito, i vincoli di installazione e le interfacce delle apparecchiature.

03

Documenti e oggetto della fornitura

Dichiarare i disegni, i test o le approvazioni richiesti, la quantità, la destinazione e il programma del progetto. Identificare eventuali requisiti obbligatori prima del preventivo.

Cosa succede se alcune specifiche non sono ancora note?

Invia le informazioni disponibili e indica i dati sconosciuti come ancora da confermare. Per una sostituzione, la targhetta esistente, le fotografie dell'apparecchiatura e i vincoli del sito aiutano a definire la verifica. I dati nominali finali e l'ambito della fornitura devono essere concordati nel preventivo e nei documenti approvati.

Discuti questo prodotto

Documenti di progetto

Il documento giusto. Per il modello giusto.

Indica i documenti necessari al progetto. La disponibilità e l’ambito applicabile saranno confermati per il modello e la configurazione proposti.

01 / DOCUMENTO

Scheda tecnica e valori di potenza nominale

Individuare il modello proposto ed i valori elettrici nominali che il documento deve coprire.

Richiesta per il tuo progetto
03 / DOCUMENTO

Documenti di collaudo e approvazione

Nominare le prove richieste, norma o approvazione, e il modello o configurazione interessata.

Richiesta per il tuo progetto

Richiedi i documenti per la configurazione proposta

Includere il modello o il tipo di prodotto, la potenza nominale, le tensioni, la frequenza e la destinazione. Richiedi il numero del rapporto, la data e l'ambito del test in modo da poter verificare che i documenti corrispondano alla configurazione proposta. Un rapporto individuale non stabilisce la certificazione per ogni modello o destinazione.

Durante l'esame di un documento, verificare che la persona giuridica, il modello, i dati nominali, l'ambito applicabile e la data di emissione corrispondano all'apparecchiatura proposta.

Leggere la guida sull'ambito del certificatoAprire il centro documentazione

Il tuo progetto / passo successivo

Le buone decisioni iniziano con requisiti chiari.

Invia i dettagli in tuo possesso. Possiamo iniziare la conversazione mentre i restanti requisiti vengono confermati.

Discuti il tuo progetto