Lompat ke konten
HEAKOR.
ID

Pilihan Anda diprioritaskan. Anda dapat mengubahnya kapan saja.

Beberapa produk dan konten teknis tersedia dalam bahasa Inggris.

Minta penawaran

HEAKOR / Pertanyaan transformator

Oil-Immersed Substation Power Transformer

An oil-immersed substation power transformer changes voltage between electrical systems, using insulating oil as part of its insulation and cooling arrangement. HEAKOR accepts project enquiries for utility, industrial and other substation applications. The proposed transformer must be matched to the system study, site layout and approved specification.

Informasi produk yang tercantum

Jenis produk
Gardu Induk

Detail ini mengidentifikasi produk yang terdaftar. Spesifikasi dan gambar yang disetujui menjelaskan peralatan yang disediakan.

Penawaran berdasarkan kebutuhan proyek
Minta penawaran proyekBaca informasi produkBuka pusat dokumen
Listrik

daya nominal · voltase · fase · frekuensi

Proyek

Aplikasi · tujuan · jumlah · jadwal

Dokumen

Spesifikasi · gambar · persetujuan yang diperlukan

Spesifikasi, standar, cakupan sertifikasi, dan ketentuan komersial perlu dikonfirmasi untuk peralatan dan proyek yang diusulkan.

Submit your substation transformer requirements with the required rating, voltages and project destination.

What must be specified before quotation?

For an oil-immersed substation power transformer, the MVA rating is only the starting point. Provide the electrical design requirements and installation constraints together so the quotation can define the equipment and document scope.

  • System ratings: kVA or MVA, high- and low-voltage ratings, tertiary winding requirements if applicable, phase and frequency.
  • Electrical design: vector group, neutral arrangement, impedance, system fault level, insulation levels and tapping requirements.
  • Thermal performance: cooling method, loading profile, losses, temperature-rise limits and noise requirements.
  • Site and interfaces: ambient temperature, altitude, terminal arrangement, available space, transport and lifting restrictions.
  • Supply scope: protection, monitoring, controls, accessories, required tests and documents.

Substation transformer questions and answers

Can I select a transformer by MVA alone?

No. Voltage ratio, frequency, winding connections, impedance and insulation requirements must also match the electrical system. Submit the single-line diagram and specification; flag any values still awaiting engineering approval.

Which tap changer and cooling arrangement do I need?

State the required voltage adjustment range, whether adjustment is needed under load, and the loading and cooling requirements. The tap-changer type and cooling arrangement must be confirmed for the proposed design. Do not assume either is included as standard.

Which standards and approvals apply?

Specify the required standard number and edition, destination-country rules, utility requirements and any mandatory certification. An oil-immersed substation power transformer must be reviewed against the exact project scope; product standards, efficiency rules, certification and utility approval are separate checks.

What documents should I request?

Identify the datasheet, general arrangement drawing, terminal details, control drawings and test documentation required by your project. State any witness-test or inspection requirements before ordering. The documents and tests included in supply must be agreed in writing.

What is needed for a replacement unit?

Provide the existing nameplate, drawings, connection details and available installation space. Include any changes to the load or network, and identify transport access and outage constraints. An equal MVA rating alone does not establish compatibility.

Request an oil-immersed substation power transformer quotation

Send HEAKOR your company name, application, project stage, quantity, destination and required delivery schedule. Include the specification or mention the drawings available for review. Identify the delivery term and named place if already decided. Final ratings, compliance, tests, price and delivery require written technical and commercial confirmation.

Submit project specifications to HEAKOR. For the category overview, see substation transformers.

Before requesting a quotation, use the transformer RFQ checklist to organize your specifications and open questions. The project requirements guide explains how to define the requested equipment and document scope.

Sebelum meminta penawaran

Konfirmasikan kecocokan untuk proyek Anda.

Nama produk atau daya nominal adalah titik awalnya. Sertakan persyaratan ini sehingga proposal dapat ditinjau untuk proyek Anda.

01

Persyaratan kelistrikan

Daya, tegangan primer dan sekunder, jumlah fasa, frekuensi, serta persyaratan sambungan, impedansi, atau tap yang ditentukan.

02

Persyaratan instalasi

Memberikan spesifikasi sistem, tata letak lokasi, batasan instalasi, dan antarmuka peralatan.

03

Dokumen dan cakupan pasokan

Nyatakan gambar, pengujian atau persetujuan yang diperlukan, kuantitas, tujuan dan jadwal proyek. Identifikasi persyaratan wajib apa pun sebelum penawaran.

Bagaimana jika ada beberapa spesifikasi yang belum diketahui?

Kirim informasi yang Anda miliki dan tandai item yang tidak diketahui sebagai dikonfirmasi. Sebagai penggantinya, papan nama yang ada, foto peralatan, dan batasan lokasi membantu menentukan peninjauan. Nilai listrik pengenal akhir dan cakupan pasokan harus disetujui dalam penawaran dan dokumen yang disetujui.

Diskusikan produk ini

Dokumen proyek

Dokumen yang benar. Untuk model yang tepat.

Beri tahu dokumen yang diperlukan proyek Anda. Ketersediaan dan cakupan yang berlaku dikonfirmasi untuk model dan konfigurasi yang diusulkan.

01 / DOKUMEN

Lembar data dan parameter nominal

Identifikasi model yang diusulkan dan parameter listrik nominal yang harus dicakup dalam dokumen.

Permintaan proyek Anda
02 / DOKUMEN

Gambar dimensi keseluruhan dan sambungan listrik

Nyatakan persyaratan pemasangan, pemasukan kabel, dan izin yang perlu Anda periksa.

Permintaan proyek Anda
03 / DOKUMEN

Dokumen pengujian dan persetujuan

Sebutkan pengujian yang diperlukan, standar atau persetujuan, dan model atau konfigurasi yang bersangkutan.

Permintaan proyek Anda

Minta dokumen untuk konfigurasi yang Anda usulkan

Sertakan model atau jenis produk, daya nominal, voltase, frekuensi, dan tujuan. Mintalah nomor laporan, tanggal, dan cakupan pengujian sehingga Anda dapat memeriksa apakah dokumen sesuai dengan konfigurasi yang diusulkan. Laporan individual tidak menetapkan sertifikasi untuk setiap model atau tujuan.

Saat meninjau dokumen, cocokkan badan hukum, model, parameter listrik nominal, cakupan yang berlaku, dan tanggal penerbitan dengan peralatan yang Anda usulkan.

Baca panduan cakupan sertifikatBuka pusat dokumen

Proyek Anda / langkah selanjutnya

Keputusan yang baik dimulai dengan persyaratan yang jelas.

Kirimkan detail yang Anda miliki. Kita dapat memulai percakapan sementara persyaratan lainnya dikonfirmasi.

Diskusikan proyek Anda