HEAKOR — TRANSFORMER REPLACEMENT INFORMATION CHECKLIST Blank procurement template | English TXT | Revision 2026-10-06 Record the information available from existing documents and photographs. Mark unknown details as TBC. Do not assume equal capacity means compatibility. This is not a product datasheet, drawing, test report or proof of certification. Entries describe the existing equipment and buyer requirements, not confirmed HEAKOR equipment. Replacement suitability requires a configuration review. Photograph only when safe and authorised; do not open or approach energised equipment to complete this checklist. 1. PROJECT AND CONTACT Company: Contact name / email: Project country / region: Application: Project stage: Enquiry reference, if available: Reason for replacement: Number of units: Target project / delivery date: 2. EXISTING NAMEPLATE AND RECORDS Existing manufacturer: Model / serial number: Year, if shown: Transformer family / installation type: Rated capacity (kVA or MVA): Phase: Frequency (Hz): Primary voltage (V or kV): Secondary voltage (V or kV): Connection / vector group / neutral arrangement: Impedance (include the stated basis and conditions): Taps / tap-changer details: Cooling / insulation medium: Temperature rise / insulation level / BIL, if shown: Applicable standard / approval markings (record exactly as shown): Existing drawing / manual number and revision: 3. CONNECTIONS, MOUNTING AND SITE Outline dimensions and mounting / foundation drawing: Terminal / cable / bushing arrangement: Primary feed arrangement: Neutral / grounding arrangement: Switching, protection and accessories: Cable entry positions and clearances: Available footprint and access: Transport / lifting / installation constraints: Indoor / outdoor installation: Ambient temperature / altitude / environment: Other site constraints: 4. NEW REQUIREMENTS Required change to capacity, voltages or configuration: Current utility / project specification (title, number, revision): Required standard(s) and edition(s): Required tests, documents, certification / listing / approval scope: Equipment scope and responsibilities: Requirements that remain unchanged: Details needing technical clarification: 5. SUPPORTING FILES AND PHOTOGRAPHS Readable full nameplate photo: Overall equipment photo: Connections and mounting photos already available: Outline drawing / one-line diagram / relevant specification: File title, number and revision: Shareable file link(s) (check recipient access): NEXT STEP Email supporting files to Heakor1@outlook.com, or paste a shareable file link into the enquiry form at https://heakortransformer.com/pages/contact. Do not include information you are not authorised to share. The existing equipment, project specification and proposed replacement need to be reviewed together. This blank checklist does not establish a drop-in replacement, technical approval or electrical / mechanical compatibility.